tpiTok ples

431kWh 320KW Mobail BESS Eneji Stoa Sistem

431kWh 320KW Mobail BESS Eneji Stoa Sistem
Ol infomesen:
Wanpela hai-kapasiti, hai-pawa mobail eneji hab we ol i wokim bilong strongim sasim na fleksibel eneji distribusen.

● Model: MBS430
● 431 kWh sistem-level eneji stoa bilong longpela hai-lod operesen
● 320 kW pawa i sapotim strongpela sasim na rausim pawa
● Dual DC channels i larim ol paralel hai-pawa aplikesen
● Hybrid cooling i save mekim gutpela wok aninit long lod i go het
● Indastriel-greid disain bilong ol mobail na hatpela envairomen
Askim wok painimaut
Daunlod
Diskripsen
Teknikel Paramita

431kWh 320KW Mobail BESS Eneji Stoa Sistem

 

431 kWh 320 kW Mobail BESS em i bilong ol bikpela pawa komesal na indastrial aplikesen, na i save givim gutpela mobail eneji bilong sasim EV, pawa saplai bilong sotpela taim, grid sapot, na imejensi bekap.

Integreted bateri stoa, hai-pefomens PCS, na tupela hai-pawa DC autput i mekim gutpela wok aninit long bikpela lod. Gutpela 'energy control' na gutpela 'thermal management', wantaim 'industrial-gred' proteksen, i sapotim gutpela na wok i go het, na tu, mobail disain i mekim wok i kamap hariap wantaim liklik 'setup' tasol.

polinovel 431kwh 320kw mobile bess

 

As tingting bilong wok

 

Sistem i yusim wanpela PCS (Power Conversion System) long kamapim DC (dairekt karent) ↔ AC (alterneting karent) konvesen, na konektim eneji stoa bateri i go long ekstenel lod o pawa grid. EMS (Eneji Menesmen Sistem) i save makim wanem taim long sasim/rausim, sediul strateji, peak-seving na lod-sifting strateji, na ol narapela samting, na BMS (Battery Management System) i gat wok long sekim status bilong bateri (temperature, voltej, SOC, na ol narapela) na lukautim gut bateri.

 

 

Ol spesifikasen bilong mipela

Working Principle
 
 

1.Eneji Kapasiti - 431 kWh:

Dispela i soim olsem sistem inap long kamapim 431 kilowatt-aua bilong eneji bihain long wanpela ful sasim.

Dispela kapasiti i makim taim bilong rausim pawa bilong sistem (long ol narapela narapela pawa autput):

  • Sapos ol i wok long rausim pawa long 320 kW, taim bilong rausim pawa em inap olsem 1.35 aua (431 kWh ÷ 320 kW).
  • Taim bilong yusim tru bai ol i stretim bihainim SOC (State of Charge) opereting strateji, sefti marjin, na ol narapela samting.

 

2.Pawa Kapasiti - 320 kW

  • Dispela i soim olsem sistem inap long kamapim o kisim mak bilong 320 kilowat pawa long instantaneous o continuous mode.
  • Dispela indiketa i go wantaim ol aplikesen senario bilong sistem, olsem 'peak shaving', 'load support', 'grid frequency regulation', na 'emergency power'.

 

 

Em i gutpela long ol nid bilong yu long kisim pawa

 

Bikpela-Pawa, Planti-Senel Autput

Em i gat mak bilong 320 kW, na dispela sistem i sapotim bikpela -pawa DC sasing na hariap eneji discharge, na tupela senel i mekim wok wantaim long mekim sevis i kamap gutpela moa.

Multi-Scenario Energy Distribution

Planti DC na AC intafes i sapotim EV sasing, imejensi pawa saplai, na 'flexible bidirectional energy flow', na dispela i larim sistem long bihainim ol kain kain aplikesen rikwaemen.

Advans Temal Menesmen

Bateri likid koling wantaim ea koling bilong ol lektrikel komponen i save holim strong 'thermal stability' aninit long hevi lod, na i save mekim sistem i wok gut na i save mekim sistem i stap longpela taim moa.

Sentralais Kontrol na Monitoring

10-inch HMI 'touchscreen' i givim klia 'system visibility' na 'intuitive operation', na i mekim gutpela menesmen bilong eneji na isipela kontrol long ples.

 

Spesifikasen
sistemik nem
klas
paramita
Bateri Sistem (BESS)
Sel
mak bilong kapasiti (Ah)
324
Opereting voltej ranj (Vdc)
3.2(2.8-3.65)
Nominal kapasiti (Wh)
1036.8
Bateri Modul
Gruping Skim
1P52S
mak bilong kapasiti (Ah)
324
Opereting voltej ranj (Vdc)
166.4(145.6-189.8)
Reit kapasiti (KWh)
53.91
mak bilong lukautim
IP65
rot bilong kolsan
wara kol
Bateri pek (hap bilong sistem)
 
 
Gruping Skim
2P208S,8 bateri modul (2 paralel na 4 series)
mak bilong kapasiti (Ah)
648
Opereting voltej ranj (Vdc)
665.6(582.4-759.2)
Reit kapasiti (KWh)
431.31
Energy Storage Inverter (PCS)
dairekt karent sait
Opereting voltej ranj (Vdc)
615-950
maksimum karent (A)
170
AC sait (tripela-feis foa-waia,3W+N+PE)
voltej (V)
400
voltej deviesen
-15%~+15%
pawa reiting (KW)
105
maksimum karent (A)
167
Grid frikwensi (Hz)
50/60
Reit pawa (maksimum pawa) (KW)
320
Sistem bilong sasim
input sait
Maksimum input pawa (A)
880
Input voltej (Vdc)
250-850
Namba bilong ol autput intafes
2 lain
autlet sait
autput pawa reinj (KW)
3-250 (pawa bilong en em 160KW)
mak bilong nau (A)
2-250
volteji mak (V)
200-1000 (voltej 1000)
Konstant (imp/KWh)
50
Ol mak bilong skelim
klas bilong stretpela
0.5
yunit bilong skelim
KWh
Intafes 1GB/T Nesenel Standet DC Pawa
Saplai Bes 1
1000Vdc , 250A
inputoutput intafeis
DC input
Intafes 2GB/T Nesenel Standet DC Pawa
Supplementing Socket 2
1000Vdc , 250A
Intafeis 3GB/T Nesenel Standet DC
Discharge Gun 1
1000Vdc , 250A
DC autput
Intafes 4GB/T Nesenel Standet DC
Discharge Gun 2
1000Vdc , 250A
Intafes 5 AC Intafes 1
400Vac, 250A indastriel pawa plag na soket
Senisim input/autput long wankain port (Not: opsenel, moakos)
 
Intafes 10 AC Intafes 6
230Vac, 10A, National Standard Five-Pole
rot bilong mekim -daun i kol
Bateri kompatimen wara kol + ilektrikel kompatimen win kol
sistem paramita
bikpela samting
sistem bilong kilim paia
Ges Bonding
mak bilong lukautim
IP54
tempereja bilong wok
-10 digri -50 digri
Sais (longpela*waidth*hait)
3205mm*1740mm*2117mm
hevi bilong ol ikwipmen (T)
Tru tru
Ausait sel samting
Precision sheet metal
Korosen resistans
C4
human-kompiuta intafeis HMI
10-inch 'touch screen'

 

 

Bilong wanem yu makim mipela?

 

Struktural Disain bilong ol Mobail Aplikesen

Em i gutpela long karim planti taim na yusim hariap, i gat strong bilong guria, strong bilong guria, na bikpela proteksen reiting, i gutpela long ol konstraksen sait, ol imejensi situesen, na ol pawa grid aplikesen.

 

Ol gutpela wok bilong bungim ol sistem

Dip integresen bilong ol bateri, PCS, EMS, na ol 'thermal management system' i mekim na 431 kWh na 320 kW sistem i wok gut na i wok gut aninit long ol kondisen bilong wol.

 

Sefti-Sentrik Disain Lojik

Multi-level BMS proteksen, ektiv thermal menesmen, na paia proteksen solusen i save daunim tru ol 'thermal runaway' na 'operational risks'.

 

Gutpela rot bilong stretim hevi bilong bikpela pawa na longpela laipspan

Taim em i winim bikpela autput kapasiti inap long 320 kW, sistem i save balensim laip bilong bateri na sistem i wok gut, na i save daunim olgeta kos bilong laipsaikel.

 

Fleksibel Grid-Konekted na Off-Grid Adaptability

Sapotim planti kain wok olsem grid-konekted, of-grid, maikrogrid, na temporari lod aplikesen, na inapim ol kain kain eneji aplikesen nid.

 

Konfigurasen we yu ken senisim bihainim ol samting we projek i laikim

Sapotim ol 'multi-dimensional customization bilong ol EMS strateji, ol kain 'interface', na ol 'environmental adaptation levels', na i no wanpela standet solusen tasol.

 

 

Sefti na Reguletori Rikwaemen

Sefti em i bikpela samting long disain na operesen bilong ol BESS sistem:

Ol kain hevi

  • Thermal runaway
  • Ovasasim/Ova-discharging
  • Hevi bilong envairomen (tempereja, humiditi)

Ol bikpela samting bilong seifti

  • Komplitim BMS monitoring na proteksen mekanisme
  • Sistem bilong lukautim hat/paia
  • Em i bihainim ol intanesenel standet olsem UL/IEC
  • Mekanikel na lektrik aisolesen long stopim ol sot seket na ol hevi long graun.

 

 

Ol samting i narapela long mobail na stesenari BESS

Pasin Fiks Eneji Stoa Sistem Mobail Eneji Stoa Sistem
Ples bilong putim Fiks ples long-sait Yu ken rausim, yu ken putim taim yu laikim
Fleksibiliti Daunbilo Hai
Saiklon bilong bekim Long-taim Temporari / Projek-bes
Planti Yusim Peak seving/vallei filing, rinewabel eneji integresen Long-sait konstraksen, imejensi, grid pik seving

 

 

Ol bikpela disain na seleksen kraeteria bilong mipela

 

Ol samting bilong tingim long makim ol samting

  • Kapasiti na Pawa Rikwaemen: Ol i wokim dispela sistem long inapim ol nid bilong aplikesen, na i gat inap eneji stoa na stebol hai-pawa autput long ol hatpela samting.
  • Gutpela wok bilong sasim na rausim ol samting na laip bilong saikel:Gutpela wok na longpela laip bilong saikel i helpim long daunim lus bilong eneji, skruim sevis laip, na daunim longpela taim opereting kos.
  • Kain kemistri bilong bateri:Ol i makim LFP bateri teknoloji bikos em i seif, i stap longpela taim, na i wok gut taim ol i save sasim na rausim bateri planti taim.
  • Menesmen bilong hat na envairomen: Gutpela 'thermal control' i save mekim gutpela wok na lukautim helt bilong bateri long ol ples we i gat bikpela hat, liklik ples, o ples we i gat planti wara.
  • Grid Koneksen Standet na Intafes: Planti grid na 'load interface' opsen i mekim wok bilong putim hariap na isi long bungim ol pawa sistem.

 

Opereting Strateji

  • SOC Seting: Ol gutpela mak bilong SOC antap na daunbilo i helpim long skruim laipspan bilong bateri na long wankain taim holim gut eneji kapasiti we yu ken yusim.
  • Skeduling Strateji: Sapotim ol fleksibel eneji menesmen strateji olsem 'peak-valley arbitrage', 'load shifting', na 'priority response' long ol 'grid demands'.
  • Sefti Majin: Ol 'safety margins' we i stap insait long en i save stopim 'deep discharge' na 'battery stress' tumas, na dispela i save mekim sistem i stap gut longpela taim.

 

 

Ol aplikesen senario

 

Imejensi na Bihain long Disasta Pawa Saplai

Givim pawa oltaim long ol bikpela samting (ol haus sik, ol stesin bilong toktok, na ol narapela) taim pawa i pinis.

Grid Ansilari Sevis

Ol i save yusim long ol sevis bilong pawa maket olsem 'peak shaving', 'frequency regulation', 'load leveling', na 'reserve capacity markets'.

Ol Projek o Konstraksen Sait Bilong Sotpela Taim

Olsem long givim pawa long ol bikpela projek sait na stopim pawa i bruk.

Integresen wantaim Riniubel Eneji

Putim pawa i kam long 'photovoltaic' o win pawa jeneresen long taim bilong bikpela prodaksen na tromoi long taim bilong bikpela prais bilong pawa.

 

431 kWh / 320 kW mobail BESS em ol i wokim bilong ol aplikesen we i nidim fleksibel diploimen na kontrolim pawa autput. Pefomens bilong sistem long 'real-wold yus i dipen long opereting strateji, lod profail, na sait kondisen, we ol i mas skelim long taim bilong projek plening.

 

 

Hot Tag: 431kWh 320KW Mobile BESS Energy Storage System, China 431kWh 320KW Mobile BESS Energy Storage System manufacturers, suppliers, factory

Askim wok painimaut
Smatpela Eneji, Strongpela Operesen.

Polinovel i save givim ol gutpela rot bilong putim pawa long strongim wok bilong yu egensim ol hevi bilong pawa, daunim pe bilong pawa long rot bilong gutpela menesmen bilong pawa, na givim pawa we i redi long bihain taim.